Sunday, 14 August 2022

Dam-break Study using HEC-RAS

Well, actually I am looking for a dam-break study which show the simulation of the dam during breaches. Unfortunately, I only see simulation with high flow in many online website and youtube. That's not a dam-break simulation.

First, there shall be a description on how to simulate the dam-break using HEC-RAS. What are limitations of software and simplified assumption. Let's talk about a real case of dam-break. Dam-break could happen due to failure of its embankment structure either due to overspilling or piping. For low-dam structure, overspilling is possible as it was not designed in high safe level. For high dams, piping failure is more common occurred. 

After, we have decided what kind of failure that we will simulate, the next step is to build dam breach size and time. How big the dam breach and when it progress until it totally breaches. An example of dam breach parameters and time progress to breach can be seen below:


https://www.hec.usace.army.mil/software/hec-ras/Ok, remember in any dam, it always any spillway structure for emergency. It means when flood occurs the high flow will go to spillway structure. So, you need to model spillway structure as a weir and breach parameters along the embankment. 


The example above is sine wave progression of breach. Normally the breach progresses constantly until it reaches maximum and start to breach total. That's why in many cases, it was simulated in sine wave progression. Of course, you are free to choose linear progression.

Once you have done with the breach parameters setup, it is important to set the geometry of the dam and 2D flow area. It can be set as 2D connection between storage and 2D area. In the example below, I set 2D connection within 2D flow area. It means the simulation will be in totally 2D. If you use connection from storage to 2D flow area, it will simulate the storage first which I don't really interest on it. So, remember to take the inflow directly from the outlet of the dam. 


You may have error messages when you started to run. In my case, the error is : "has a weir elevation lower than the cells they are connected to". The error is obvious that your weir levels some are lower than the 2D elevation levels. What you need to do is change the weir elevation higher. Make sure all are higher. As my original weir levels were determined from terrain levels, there will be slightly different due to interpolation and cell size matter. The easiest way is just copy the weir levels and add with roundup formula in excel. 


If no error messages again, you can see that the model is running again. Wait until it finishes run and check the results. Make sure that everything is make sense and as what you wish for.


The last but not least is to check the results. This is the tricky part. You have at least understand the concept of hydraulic. Imagine how much flow it is and where it flows and whether the process from low to high to breaching time all are make sense. 

If you are just focusing on maximum values, it could be enough. But I like the process where the starting point, the progress and final flood maps shall be acceptable. In some cases, you may need to refine your 2D meshing area and cell size. 







  

Sunday, 15 May 2022

Ancillary Structures of Reservoirs

In reservoirs, there are structures that used to support the operational such as spillway, gates, embankment and pumping system. In this post, I would like to explain about spillway structure. Spillway is a structure that used to divert the flow during extreme events. When flood occurs, the water level will rise higher than normal time. This must be anticipated by providing a spillway structure. The spillway structure will bring all the overflow water to the downstream area. Besides to protect the embankment from flood flow, the spillway will also minimise the flooding at the downstream area. 


One of types of spillway is Ogee spillway. The shape just likes triangle. It was designed as certain flood level. If flood level higher than crest level of the spillway, it start overspill. The example of oree spillway is shown in figure below.


The video of the ogee spillway: Apa itu Spillway? - YouTube







Saturday, 16 April 2022

Do you believe in Climate Change?

There are some questions out there regarding is that climate change is true? well, recently I worked for a project that forced me to look at various data including long-term rainfall and temperature data. This is rainfall data in Australia. If we compared the long records with current rainfall data, surprisingly, the four months cumulative rainfall has more than any annul record from 1859 to 2021. 


I also looked at the climate data from Singapore, the temperature has rise significantly. If looked at long-term trend, we can conclude that temperature is getting higher.


In term of rainfall, it is going up and down as a normal pattern. But if look at the average rainfall, we can see that it is going up. 

You may believe or not, but this a real data that tell you something happening in our climate. Another question is do we need do something or no need as it may just a climate change. 






Sunday, 10 April 2022

Data Analysis

When you work with hydrological data, it is always good to screen and assess the quality of data. These kind of questions must be answered such as how many years of available records? and missing data. Rainfall data will useful if it is no missing data. The missing data will cause the values are less which subsequently cause the rainfall accumulation is less.  One of software that I commonly used is HEC-DSSVue. 


Besides, for visualization purposes, this software can be used to manipulate data using math function and for database input that will be used in HEC-HMS or HECRAS (see example of rainfall data below).




ProjectLibre

 It is always interesting to learn something new. A few days ago, I have learned ProjectLibre and I think this is cool that every project engineer/manager must learn about it. If you have familiarized with  Microsoft Project, then this software is exactly the same. The best one is that this software is free. 

You know whatever project is running, you need to monitor the progress and before that, you need to have a plan internally or you need to share with you client. This software can help to do it.  As an example, see Figure below showing the ProjectLibre for a simple kitchen and bathroom renovation project.


Beside for planning and update the progress, this software is also capable to manage manpower and budgetary. You can assign manpower as you wish and control the budget. 




Friday, 14 January 2022

Working as Water Engineer in Malaysia

I write this article when I am in airport leaving Malaysia after 5 years working as water engineer in Malaysia.

For the last 5 years I worked with 2 consultancy firms. Here what I learned and experineced during my stay. 

1. Style

Different company has different style of working. In general, the team has been squezzed from time to time. In some projects, I worked as one-man-show person. The system is not strong. It depends on person-in-charge and the boss who are handling it. It is good and bad actually. The young engineers can learn a lot from many fields and prespectives. But it could give more burden to senior engineers. 

2. Salary

This is sensitive but most of people may aware that engineers not paid well. Malaysia has a program called Protegé to hire fresh graduates with low paid to expose with engineering field. My first impression is that the young engineers won't work hard due less paid. 

Whatever the condition, give a proper salary to the young engineers will motivate them to working hard. It will benefit companies and fasten the transfer of knowledge. In general the salary for fresh graduates is about RM3,000 but I think it must be noted clearly that it is take home pay. It means the costs related to work requirements must be covered by the companies.

For senior levels, it is between RM 5,000 to 10,000. The program to retain thr senior levels must be clear. However, I see in some companies were not well defined. When you are in senior levels, usually you don't want to jump to other companies unless it is really necessary. The flow chart for senior levels must be clear. 5-yrs experience will be endorsed as senior engineers. 8-yrs experience will become accociate. 10-yrs experience will become director. Or it could be other ideas like share holding persentages. This kind of thing must be stated clearly.

3. Working time

It is a standard that the working hour is 8 hrs a day. However, as engineers there are a lot of thing to do that make you overtime. Some companies, they compensate with cash and other with leave. I don't think it is not a wise decision to give leave for overtime. Because the other day, you have to do other works. The best option is still with cash. 

Thursday, 1 August 2019

Understanding Hydrological Procedure No. 4 and Its Application





I was privileged to give a training on "Understanding Hydrological Procedure No. 4 (2018) and Its Application" organised by Malaysia Water Partnership (MyWP) and UNESCO-IHP Malaysia. Hydrological Procedure No. 4 (HP 4) is a procedure to calculate peak floods in ungauged rural catchment of Malaysia. It was originally developed in 1974 and updated in 1987 covering only Peninsular Malaysia. In this update, the HP4 has considered all the hydrological data up to 2017 with covering areas include Peninsular Malaysia, Sarawak and Sabah. HP4 was developed using Regional Flood Frequency Analysis (RFFA) based on Index Flood Method. The assumption of this method is that the flood characteristics in a homogeneous region are similar in terms of its Mean Annual Flood (MAF) and Flood Frequency (FF). MAF formula was developed using multiple-linear regression with acceptance criteria R2 > 0.7 and PBIAS < 25%. For FF formula, it was developed using the goodness-of-fit test (Ztest) where a distribution is acceptable when Ztest < 3. The detailed formulas and its regions can be found on the HP4 manual in this Link. The most important things that I was highlighted during the training are: - All data used in this analysis has limitation (i.e. spatially, temporary and accuracy). - Every method (regression and statistics) has its own considerations and limitations. Finally, all models are wrong but some of them are useful. Hopefully, this hydrological procedure will be useful especially for young engineers and students.


Friday, 19 October 2018

2D Flood Modelling in HEC-RAS

In this post, I'll tell you how to construct a 2D Unsteady Flow Analysis using HEC-RAS. In most of water-related projects, hydraulic analysis is essential to assess an existing water system and further to propose mitigation measures if necessary.

Before we start with the tutorial, knowing why we need to have a 2D model is important. There are some reasons why a 2D model is needed. First, if you want to know the flood extent of your interest area then certainly you need a 2D model. Second, if your study area has large flood plain areas it is a sign that you need a 2D model. In many projects anyway, 2D modelling is required. So, lets start with what data are needed:

a 2D hydraulic model needs inflow hydraulic in the upstream boundary condition. The inflow hydrographs can be a streamflow record of flood event or design inflow hydrographs. For design inflow hydrographs, it can be used HEC-HMS software (Separated Post will discuss about this).
The example of inflow hydrograph is shown below:
Inflow Hydrograph
As you can see, the inflow hydrograph show the time series of flow in m3/s during flood event.


continue.....

Monday, 3 September 2018

Uncertainty in Hydrology

I have been working and developing hydrological models in many cases. From the simplest model (Lumped Catchment model) to the integrated and complicated model (MIKE SHE). I realised that every model has its own assumption and limitation. This is something that every hydrologist must understand well. I recommend to all new hydrologist to have a look the manual and standard procedure of any kinds of model do you use. For example, rational method is the simplest and commonly model used to calculate flood discharge. This method is not suitable in a bigger and undeveloped areas. Similarly, physical based model will give you a number of parameters that you need to put. The more detailed the model, the more uncertainty it is. We are dealing with nature which partially cannot be predicted. So know the limitation of the model is important.

The are two ways in hydrological model: stochastic or deterministic. Some scientist may prefer to use deterministic model. This means every steps in hydrological processes are determined. Contrary, stochastic model doesn't really care about the processes. The main concern is inputs and outputs. As long as the input can predict the outputs accurately, then the processes are neglected. We have to understand the limitation of each model. Deterministic models for example, it requires parameters which cannot have an exact values. There are people try to come up with the parameters but all are based on study which may not applicable in other areas. Stochastic model is a future model. Stochastic model relies on samples data. The more we have data the better model prediction. The samples data is also problematic. To predict accurately, the data must be good in quantity and quality. In term of quantity, the numbers of data must really represent the geographical condition spatially. For example, rainfalls depend on latitude, longitude and altitude. These major parameters in determining the rainfall depth. So the numbers of rainfall stations must really represent the latitude, longitude and altitude. In the area where the surface areas are undulating, more stations are required.
Rainfall Stations
In term quality, I found many data are not well screened. It was simply collected without any proper screening processes. Field data measurement can be error in many ways. The rainfall data for example, the location and position of the rain gauge is determined the accuracy of the measurement. In monsoon times, the rain was not fell vertically. It was influenced by strong wind which may cause the collected rain are less than the actual rain. If we understand the uncertainty of the data, we can go to next step to develop stochastic model.

I believe, stochastic model is a future model. Many water agencies have invested a lot in data collection. It means in the future, we will have more data accurately. the stochastic model will be much robust then before and it can be used in more wider regions.
Stochastic Model of Peak Floods


Friday, 27 October 2017

Psycology in Water Related Project

Pyschology is a science which study the behaviour and thinking of individual or groups. This science seems unrelated with water projects but today I learned that this science is important.

Currently, I am handling a flood mitigation projet with total cost of  USD 2.4 million. We have a technical meeting to disscuss about which available options that can be implemented in this project.

Friday, 20 October 2017

Python

Programming languages are something important in our digital era nowadays. After I did a little research on what kind of programming languages that I should learn. The answer is PYTHON. Therefore, I dedicate a special page in my blog to discuss and elaborate about python on how we can master this programming language effectively.
The first question came into my mind is why Python? These are the reason why I choose Python:
1. Python is high level programming language. We don't need to make variables or argument declarations. It is straight-forward coding.
2. You don't have to do a coding from scratch. Some people certainly have developed it for you. What you have to do is revising it and update to suit your intention.

Ok, lets start with tools you need to have to run python. It depends on what kind of operating system you have, it will slightly difference the methodology. Most of programmers they prefer to use Linux which could be true. Myself use Linux, it is usually I am working using company PC which is not allow to install any softwre without permission from IT department. Therefore, I installed Virtual Machine using Linux to explore Python.
1. Install Python
No need. Linux already bring along the python.
2. Environment
So, you have language (i.e. python) but you cannot use it until you have environment or place to understand the language. I use miniconda, the mini version of anaconda.

To install miniconda:
donwload the file from https://conda.io/miniconda.html
open your terminal and direct to download folder
cd donwload/ and install it


Tuesday, 17 October 2017

Regional Flood Frequency Analysis

Regional Flood Frequency Analysis (RFFA) is one of methods which commonly used to determine design floods in rural areas. The example of utilising this method is for designing water-related structures such bridges, regulators, and dams.
Probability Distribution of Annual Maximum Streamflow

Two major steps in creating RFFA are: (1) determine the homogeneity regions (2) produce a frequency curve. Both of these steps need statistical analysis specifically probability distributions.
Among many method of RFFA, Index Flood Method initiated by Darlymple (1960) is the famous one. He proposed that homogeneity region is based on recurrence interval of 10 years and probability distribution using EV 1 with method of moment (MOM). United States of Geological Survey (USGS) is also adopting this method in their standard procedures.

To do this analysis, the first step is collecting the data. The importance data needed are as follows:

1. Annual Peak Flow
Annual peak flow or Maximum Annual Flood (AMAX) usually can be collected from water authority. This is a peak daily discharge within a year. The data was derived from rating curves of water levels and flow measurement. It is important therefore to check the raw data and plot them together so we can get the sense of the quality of the data.

The data must be random and independent. If the peak discharges are getting higher and higher over the years. This is an indication that we cannot use this data. Probably due to rapid development or control structures have been built in the catchment area.

2. Annual Rainfall
Annual rainfall is a cumulative of rainfall within a year. Similar to flow data, the rainfall data should have not a trend over the years. If the data higher from time to time or vice verse then it cannot be used as it was not independent anymore.

3. Catchment Area
Catchment area is the most significant parameter in determining the peak flow. Other factors such as slope, altitute, may also contribute to rising flow significantly. However, adding more parameters which make formula much complicated and the results are significantly improved, it is better to take the simple one but still represent the reality.

Saturday, 12 August 2017

Penyaring Sampah

Baru-baru ini ada kawan saya menanyakan apakah bisa bikin desain untuk penyaring sampah. Saya jawab bahwa perusahan tempat saya bekerja sudah pernah membuat sistem hidrolik penyaring sampah. Kemudian saya tanya berapa kapasitas sampah untuk disaring? Jawabannya Kali Ciliwung kira-kira berapa ya....

Seperti kita ketahui bersama Kali Ciliwung adalah salah satu sungai yang punya tingkat polusi tertinggi di dunia. Sampah apapun baik sampah domestik, industri, barang bekas ada di sana. Perkiraan sampah yang ada bisa sampai 60 ton ketika musim hujan. Hal yang tidak mugkin dilakukan penyaringan sampah secara otomatis. Jalan satu-satunya yaitu dengan mengangkut sampah secara manual yaitu menggunakan krane diatas pontoon dan truk pengangkut sampah.

Melihat kompleknya permasalah kali ciliwung, saya sarankan dengan menggunakan penekanan sosial di kawasan tadah hujan. Faktor utama sampah di Kali Ciliwunga adalah kesadaran masyarakat dalam menjaga kebersihan lingkunhan khususnya sungai. Itu dulu dilaksanakn secara intens dan berkesinambungan. Setelah itu bisa dilakakukan managemen pengelolaan kawasan tadah hujan. Tentu saja apapun solusi yang diterapkan harus melibatkan masyarakat secara aktif.

Friday, 11 August 2017

Jobs in water sector

After I graduated from UNESCO-IHE in April 2015, I am back to my home town in Kediri, Indonesia to meet my family. While I was enjoying togetherness with my family I tried to apply jobs which related to my background study. Surprisingly, it is not so hard to get a job in a water sector. After 3 months of trying, I got 3 job offers. The fist offer is come from a local NGO which has water quality monitoring project in Ciliwung River. This offer is based-project job which means they only need me on the specific project. After project has done, I need to find another job again. This is dilemma for me as I have a family to feed. The next offer is a PhD position in one of reputable university in Malaysia. I was thingking this is a good option for me but then I need a real experience not just study. Finally, I chose the last offer i.e. working with a water consultancy firm in Malaysia.

One thing that could be important during finding a job in a water sector is connectivity. IHE is the most reputable inatitute to create water profeaaionals around the world. Wherever I go, I alwaysJ find alumni that can support me i  many aspects. So, thanks to IHE for doing a great job and wish can withstand forever.

Monday, 21 November 2016

Hydrology in Quran

وَجَعَلْنَا مِنَ الْمَاءِ كُلَّ شَيْءٍ حَيٍّ  (QS. Al Anbiya':30)
..... And we create every living things from water.....

Water is the main substance of our life. We maybe still survive by only drinking water without eating. But for sure, we going to die just eating without drinking in a week. Besides for drinking, we also need water in almost all of our activities. For examples: washing clothes, watering garden, as a source of food, for irrigation, energy, transportation, etc. Moreover, the astronaut when looking for a new planet, the first material need to look for is water. This is an indication that planet is alive. In detail, Allah also mentioned that every moving creatures were created from water.

              ۚ وَاللَّهُ خَلَقَ كُلَّ دَابَّةٍ مِنْ مَاءٍ ۖ فَمِنْهُمْ مَنْ يَمْشِي عَلَىٰ بَطْنِهِ وَمِنْهُمْ مَنْ يَمْشِي عَلَىٰ رِجْلَيْنِ وَمِنْهُمْ مَنْ يَمْشِي عَلَىٰ أَرْبَعٍ
                                                                                                يَخْلُقُ اللَّهُ مَا يَشَاءُ ۚ إِنَّ اللَّهَ عَلَىٰ كُلِّ شَيْءٍ قَدِيرٌ

"Allah has created every moving (living) creature from water. Some of them crawl on their bellies, some of them walk on two legs, and some of them walk on four legs.

Besides talk about water as the essence of living things, Al-Quran also mentioned water as 

On progress....
   


Wednesday, 3 August 2016

Uji Tarik Pada Struktur GSC (Karung Pasir)

Berikut ini adalah jurnal yang saya buat tentang uji tarik pada sturktur Geotextile Sand Container (GSCs) atau karung pasir untuk mengetahui pengaruh rasio pengisian pasir dan juga gaya gesek permukaan struktur GSC tersebut.

Donwload link.


Wednesday, 13 July 2016

Feasibility Study of Hydropower

Back to Part 1

Feasibility study is a process of finding a feasible project for further development. This term should keep in mind of all engineers. As I know many works done by consultant always have a conclusion that the site is feasible for further development. In this case is a feasibility study of Mini-hydropower. This conclusion shall refer to real finding and thorough study and not just to get a job. If the findings show that the site is not feasible then the conclusion should say NOT feasible and need to find another location to be studied. Do not ever compromise with quality. In the same time, we may offer another location to be studied that maybe accepted by client.

In the field of hydropower especially Mini-hydropower (1-10 MW), I found that this business is booming in Indonesia. After government  has decided to increase the feed-in tariff to USD 0.12 / kWh, many investors interested to invest in this field. Furthermore, this chance has attracted the local proponents to bridging between investors and local government. So, a simple and rough pre-feasibility were conducted by them and sent it to investors. For example, they mentioned that in the specific river has potential of Mini-hydropower with capacity of 9MW. With knowing the feed-in tariff, for sure the investors would interest with that proposal. After checking the potential location it was found that actually the potential power is not 9MW. Furthermore to generate 5MW it is much difficult to be realised.

Technical aspect is important but there are some other factors that much influencing the successful of project i.e. local government. Local government plays an important role to the successful of mini-hydropower development. When an investor interested to develop hydropower, they will come to the local government to assess their area whether has a potential for developing hydropower. If the local government is good, then they will proceed the permits accordingly otherwise they will ask something in such a way they gonna get money (i.e. corruption).

   

Sunday, 10 July 2016

The Atlantean Conspiracy: 200 Proofs Earth is Not a Spinning Ball

I have no idea about the earth anymore. It seems the description of earth is totally different with what I learned during study in colleges. Link below shows the proofs that thett earth is not what I was thinking and maybe you also think. Take a look this:
The Atlantean Conspiracy: 200 Proofs Earth is Not a Spinning Ball

So, what do you think?

Wednesday, 4 May 2016

Free Data and Software for Hydrology and Hydraulic

Introduction
In many water-related projects, hydrology and hydraulic analysis is enviable process that need to be properly conducted. In the hydrology analysis, the availability of data is the most concerning issue especially in developing and emerging countries. Basically, data used in the hydrological analysis are as follows:
ü  Rainfall data
ü  Landuse map
ü  Contour/ land surface slope
ü  Soil properties
ü  DEM
Those data are important in the process of setting up the hydrological model. In the hydraulic analysis, data are retrieved from the hydrological model (i.e. hydrographs). Besides that, some data are needed in constructing hydraulic model. Generally data below are required in the hydraulic modelling:
ü  River/ channel cross sections
ü  Detail hydraulic structures (e.g. weir, pump, bridge,      sluice, etc)
ü  Floodplain
ü  Water level and discharge

Sources of Data
As data is essential in hydrology and hydraulic analysis, the availability of its data is important. However, some data are treated as confidential and some of them are subject to commercialization. Fortunately, some organizations and authorities open their source of data. The following are source of data that we can download for free:

1.  USGS EarthExplorer
United States Geological Survey (USGS) provides certain data which is important in hydrology analysis e.g. Aerial Imagery, Digital Elevation, Digital Maps, Land Cover, Radar, etc. Here is the link: http://earthexplorer.usgs.gov/

In order to download the data, it is required to register and then specify the interested location and type of data. If the data is available, the download files will pop out and ready to be downloaded.

2. NASA
Through their project called Tropical Rainfall Measuring Mission (TRMM), NASA has provided daily rainfall data with the grid size of 0.5 x 0.5 degree. Find out the data in the link below:
The other free available rainfall data is provided by NOAA

Software
                 1.    GIS
         Pre and post-processing data is key aspects in measuring the quality of water-related projects. GIS is the only way how to deal with it.  The most powerful and used for GIS processing is ArcGIS. As this software is not free, there are several freeware can be used as alternative.

v        QGIS
QGIS is a powerful tool for GIS processing data. Most of essential tools for hydrological analysis are available in QGIS plugin.

v        GRASS GIS 
If you want to process your LiDAR or remote sensing data, this free software is the most recommended.

v        SAGA GIS
If you want to know the quality of Germany product in GIS tool then this software is the answer.

v        HydroDesktop
If you need to visualize and analyze hydrologic and climate data, this software is suit for it.

2.     Hydrological software
v        HEC-HMS
One of Product of US Army Corp of Engineers is very famous in hydrological modelling. It’s free and provides several hydrological methods which almost applicable in many places.

v        Other hydrology models
If you are interest trying different hydrological model that most of people not familiar with than you can access this link: https://csdms.colorado.edu/wiki/Hydrological_Models

3.          Hydraulic software
v         HEC-RAS
No one deny that this hydraulic software is awesome. The newest version is 5.0 which you can use to simulate 2D flood modelling. If there is free out there why still need to buy??? Ask why..

v         SWMM
SWMM is a 1D stormwater network modelling. It suits for modelling sewer or stormwater network underground.

After all, no matter what software that you are going to use, the most important things how you understand the physical meaning behind it. Thus, interpreting model result is also the important part. The other thing is garbage in garbage out. If you don’t have a good data in terms of quantity and quality, do not try to build the model otherwise it will be just a garbage. Last but not least, do not stop sharing your knowledge even it is just a tiny sand. You never know how it benefits others.


Add in comments if you know more about the available data and free software out there. Thanks!!